Select Page

Chinese Suppliers Highway Guardrail Forming Machine

Chinese Suppliers Highway Guardrail Forming Machine


Merchandise parameters

Uncooked Content:
Steel quality:  Q235
Thickness:   2.five~four.0mm
Coil inner diameter:φ508~φ600
Coil out diameter: ≤φ1900
Coil excess weight: ≤10T
Automated decoiler – Feeding – Leveling – Punching and reducing – Roll forming – Solution packing manually

The Composition of Equipment

Computerized expansion decoiler

1.CZPT unrolling device,  

2.Adopt automated enlargement method, electricity 2.2kw  

three.Maximum coil bodyweight: ten,000kg,

4.internal diameter: 450-600mm, out diameter max 1900mm  

5.with brake method.

Feeding & leveling

wall plate kind nine rollers leveler, 2 roller feeding, 7 roller leveling. Leveling roller 120mm, materials 40Cr, warmth treatment HRC48º~52º. 4 stand roller to manage sheet up and down movement. Power: 11kw, inverter changing, pace: ten-25m/min, feeding width max 500mm.  

Punching and slicing:

1.Use four column variety push from Yangli group, equip with punching and reducing die established, in shape for 9 or 10 holes. With one set of center gap punching, cylinder dia 160mm, traveling length: 60mm

two.Cut to size by encoder: length precision 4320±2.0mm, length can set in PLC.

3.Quickly feeding unit: right after slicing, sheet feeding into roll forming device, two.2kw, roller Dia: 120mm, materials 40Cr, HRC48º~52º.

Roll forming device

1.Major motor energy: 45kw

2.Push: gearbox driving, 10units, GY230  

3.Main shaft diameter: 80mm and 40Cr steel

4.Roller material: GCR15 quenched 58°-62°, chromed

five.Roll station:12 stations

six.Velocity: two-3pieces per moment (4320mm size)

Output table

Management panel

1.Management technique

2.Voltage, frequency, period: 380v, 50hz, 3phase

three.Computerized length measurement: A single-unit tooling of duration measuring which is flippantly pressed on the area of the metal sheet the tolling will roll with the relocating velocity of the steel sheet and then feeling to evaluate its size.

4.Automatic amount measurement

five.Computer utilised to control length & quantity, equipment will immediately minimize to size and stop when required quantity is reached

6.Duration inaccuracy can be amended simply

seven.Manage panel: button-sort swap, touch screen

8.Device of length: millimeter

9.Defense function

ten.Motor in excess of: Load protection

eleven.Program above: Current safety

12.Brief circuit security

e. Further function

Show overall length produced

Exhibit whole amount developed

Display forming velocity

 

Item display

CZPTer go to

Certifications

Business data
Our company is specialised in various sorts of products. We adhere to the principle of good quality initial, provider 1st, steady advancement and innovation to meet up with the buyers for the administration and zero defect, zero problems as the high quality objective. To perfect our provider, we make our merchandise with excellent quality at the sensible value. The major products are high-speed railing molding products, U-formed column forming tools, iron tower processing tools, metal framework processing tools, sheet processing tools, flange forming products, flame cutting equipment, plasma chopping equipment, laser slicing equipment, hollow glass aluminum spacer Generation line, hollow glass heat edge strip generation line, furnishings manufacturing line, CNC engraving machine, hollow aluminum strip, hollow sealant, and so on. Its goods are extensively employed in street and bridge development, development metal framework, electric electrical power tower, auto production, home furniture production, decoration and decoration industries.

Packaging & Shipping

FAQ:

one.How to preserve the machine?
Answer: insert mechanical lubrication products to chain, bearing and reducing slide each and every month. Include mechanical lubrication to the circumstance every single 50 % a 12 months. 

2. Do you sell only regular equipment?
A: No, most of our devices are constructed according to buyers technical specs, utilizing leading model title factors.

3.How many workers to work the equipment?
A:Only one-2 staff.

four. What can you do if the equipment damaged?
Our machine’s guarantee period is 12months,if the broken elements can not be repaired,we can send out the new components to exchange the damaged elements for free of charge,but you require pay the express expense oneself.if over warranty period,we can for to remedy the difficulties via negotiation,and we supply the complex assist for the entire existence of the equipment.

five.How can I trust you that machines pasted screening managing just before delivery?
A:  1) We report the testing video clip for your reference. Or,
     2) Remember to go to company and test device if practical.

Chinese Suppliers Highway Guardrail Forming Machine

gear chain

As one of leading gear chain manufacturers, suppliers and exporters of products, We offer gear chain and many other products.

Please contact us for details.

Mail:gear-chain.com

Manufacturer supplier exporter of gear chain

Recent Posts