Select Page

G80 Heavy Duty Master Link Load Chart for Lifting

G80 Heavy Duty Master Link Load Chart for Lifting

 

Merchandise DESCRIPTION

The CZPT Hyperlink Assembly is made up of a main ring, two or more sub-rings, in which the primary ring is fully solid, the sub-ring is welded, and the materials is Alloy metal. The specification is one-a hundred tons,and the protection element is 4 times.

It is mainly employed to assemble the spreader. The sub-ring is connected with the Hyperlink Chain and thechain relationship, and is assembled into a synthetic rigging for lifting weighty objects and gear.

It can be utilized for machinery,industries.

The solution has handed the environmental management program certification, and can handlethe product certification of well-known classification societies this kind of as CCS, LR, DNV, and so forth.

The item has substantial toughness, gentle excess weight, beautiful design, robust versatility, diverse capabilities, and hassle-free security inspection

  Technical PARAMETERS

       A-345 master link assembly             breaking load (4XWLL)
specification Within duration  Inside width diameter WLL(T) Excess weight(KG)
three/four one hundred forty eighty five 70 forty 20 14 4.two one.67
seven/8 160 85 ninety five 40 22 14 five.3 two.two
1 178 a hundred 89 60 twenty five eighteen 8 3.29
1-1/4 220 100 110 60 32 22 14 six.3
1-1/two 267 a hundred and eighty a hundred thirty five a hundred 38 thirty 21.two 13.7
one-3/four 305 a hundred and eighty 152 100 45 32 thirty 21.25
two 356 180 178 100 50 38 39.4 thirty.34
two-1/4 406 180 203 100 57 45 45 39.87
two-one/2 406 355 203 178 sixty four 50 55.5 64.four
two-3/four 406 406 241 203 70 57 sixty three 89
three 457 406 228 203 seventy six 64 70 112.14

 

 

Typically packed in plastic baggage, and then in export carton, high high quality pallets Shipping Depth: Usually twenty five-30 functioning times after getting your advance payment.Bulk packing
Packed in wood instances
Packed in paper bins, then in pallets
Shipping and delivery Element: 
Normally 25 times after acquiring your advance payment. 

 

FAQ

1.Are your maker or Investing Organization?
Initial rigging is expert maker, far more than 20 years experience.
two. What merchandise do you provide?
one) Lifting website link chain, Coal Mining chain 
two) Spherical CZPT link 
three) Other associated products 
3.What is your direct time?
Normally twenty five-thirty working days after receiving your progress payment.
4. How do I receive the merchandise ? 
FOB, CFR, CIF are most frequently used trade phrases.  
five.How do I pay?
TT(Telegraphic Transfer),30% payment in advance, 70% balance 
ahead of shipment.

Get in touch with US

Any fascination you should come to feel totally free to contact Nancy!
Web site:

G80 Heavy Duty Master Link Load Chart for Lifting

gear chain

As one of leading gear chain manufacturers, suppliers and exporters of products, We offer gear chain and many other products.

Please contact us for details.

Mail:gear-chain.com

Manufacturer supplier exporter of gear chain

Recent Posts